Bridge Construction
Our company capacity encompasses a broad range of bridge construction experience and includes expertise in:
With extensive experience across each of these areas Nelmac is able to offer a solution to suit individual requirements whilst still possessing extensive expertise and quality.
Prestressed Concrete Products
Nelmac own and operate its own precast yard capable of manufacturing a range of prestressed products and is prequalified to CC level with the RMS for the manufacture of:
Piling
Nelmac owns and operates its own fleet of piling equipment with its pile driving procedures allowing the rig to be placed 6 metres from centreline of the pile therefore, minimising the risks associated with unstable materials around piling site.
Nelmac's preferred method for pile driving over waterways is through the use of temporary bridging. This in turn reduces the environment impact on waterways, requires minimal (if any) backfilling of waterways and minimal disturbance of surrounding banks.