Certification 9001 Certificate 4801 Certificate 14001 Certificate
©Copyright Nelmac Pty Ltd 2024. ABN 65 105 667 856. Hosted by Coxtech. Site by Ian Cossor Design

Candalagan Creek Bridge

Project Description: This Contract is for the construction of a new bridge over the Candalagan Creek. The bridge is a new concrete bridge designed to meet current standards and codes and will provide for a durable higher carrying capacity bridge to service the Eurobodella region:
Client: Eurobodella Shire Council
Tender Sum: $1,586,352

Bemboka Bridge

Project Description: Roads and Maritime Services has commenced widening the bridge over the Bemboka River on the Snowy Mountains Highway at Moran's crossing, approximately eight kilometres south-west of Bemboka.

The proposed bridge is approximately 94 metres long and almost 7.5 metres wide. It will be built immediately downstream of the existing bridge and used by westbound traffic.
Client: RMS
Tender Sum: Bridgeworks $3,439,337

Lachlan River project at Gooloogong

Project Description: This Contract is for the construction of a new bridge over the Lachlan River. The bridge is a nine span precast pre-tensioned concrete Super-T girder structure with a composite reinforced concrete deck slab with the beck structure continuous over the piers. Deck expansion joints and concrete approach slabs are provided at both abutments.
Client:
Client: Roads & Maritime Services (formerly RTA)
Tender Sum: $9,000,000

Fitzgerald Bridge replacement project at Aberdeen

Project Description: This Contract is for the construction of a new bridge over the Hunter River at Aberdeen and approximately 0.7km of approach roadwork’s on Highway No. 9, the New England Highway, from 12 km 420 to 13 km 320 north of Muswellbrook. The project involves the construction of a new bridge to the west of the existing northbound and southbound Fitzgerald Bridge to carry one lane of traffic in each direction and the construction of the realigned approaches to the new bridge.
Client: Roads & Maritime Services (formerly RTA)
Tender Sum: Bridgeworks $16,500,000
  Current ProjectCurrent ProjectCurrent Project

Replacement bridge over Bogan River 43km East of Bourke

Project Description: The works in this Contract comprise of a replacement concrete bridge 70m long over the Bogan River on the Kamilaroi Highway approximately 43km east of Bourke.

The design of the new bridge provides for three spans (19.95+20.00+30.00m) of precast pre-tensioned Super T girders with a composite reinforced concrete deck slab. The deck is continuous over piers. Deck expansion joints and concrete approach slabs are provided at both abutments.

The reinforced concrete abutments are supported on 400mm square driven reinforced concrete piles. Each pier comprises a reinforced concrete headstock/column wall/pilecap supported on 400mm square driven reinforced concrete piles.

Client: Roads & Maritime Services (formerly RTA)
Tender Sum: Bridgeworks $3,525,000

Replacement bridge over Boree Creek 32 km west of Orange

Project Description:

The works under this Contract comprises the construction of the replacement bridge over Boree Creek.

The replacement bridge comprises two spans (26.5m & 22.5m) of precast pretensioned concrete Super T Girders with a composite reinforced concrete deck slab. The deck is continuous over the central pier. Deck expansion joints and approach slabs are provided at both abutments.

Each reinforced concrete abutment is supported on three 1050mm dia cast-in-place reinforced concrete piles. The central pier headstock is supported on two 1050mm dia columns on 1200mm diameter cast-in-place reinforced concrete piles.

Client: Roads & Traffic Authority - Parkes
Tender Sum: Bridgeworks $1,667,000

Replacement two new bridges at Tevens Road, Ballina

 

Project Description:

The works under this contract involves the construction of two new bridge to replace the two existing timber bridges over the Emigrants and Maguites Creeks on Teven Road Ballina

The new bridge consists of: Maguires Creek: Seven 12m spans of post tensioned PSC Planks with a total width of 10.8m which includes a 2m wide shared pedestrian/cyclist path.

Emigrants Creek: Nine 12m spans of post tensioned PSC Planks with a total width of 10.8m which includes a 2m wide shared pedestrian/cyclist path.

Bridgework include driven 550 octagonal pre-stressed reinforced concrete piles, reinforced concrete columns and headstocks, post tensioned precast concrete planks.

Works under the contract also include:

  • Traffic Control
  • Construction of temporary staging
  • Erosion and Sediments Control.
Client: Ballina Shire Council
Tender Sum: Bridgeworks $3,706,000

Design and construction of a new bridge over Billabong Creek, Holbrook

Project Description:

The works under this contract involves the design and construction of a new bridge to replace the existing bridge on the Holbrook Culcairn Road, Holbrook.

The new bridge consists of one 30m Span and two 28m spans with an overall width of 10.560m. Spans consist of four, 1400mm deep Super T girders. Bridgework include 750 and 1200mm bored cast in place piles, reinforced concrete columns and headstocks, Super T girders and reinforced concrete deck overlay and kerbs.

Client: Greater Hume Shire
Tender Sum: $2,832,000

Design and construction of 10 prefabricated bridges

Project Description:

The works under this Contract comprises the design & construction of 10 replacement bridges and approach roadworks at various locations in North West Victoria as part of the Department Of Sustainability and Environments bridge replacement program

The replacement bridges generally comprises single & two span prefabricated bridges consisting of driven H Piles supports steel substructures. The decks consist of 2.5m x 4.6m wide precast RC Deck Units

Steel components are manufactured at our Engineering premises with the Deck Units being manufactured at our precast yard in Yackandandah

The Scope of Works has subsequently been increased 4 structures.

Client: Department of Sustainability & Environment
Tender Sum: Bridgeworks $3,456,000

 

Recent Projects